Bengaluru Metro Pink Line Opens November 14 – Route, Six Stations and Ticket Fares

November 15, 2026 10:55 AM
Bengaluru Metro Pink Line Opens November 14: Route, 6 Stations and Ticket Fares

Bengaluru Metro Pink Line Opens November 14 – Route, Six Stations and Ticket Fares

Bengaluru’s Namma Metro has opened its first operational elevated section of the Pink Line for passenger services on November 14, 2026.

The newly inaugurated corridor covers 7.5 kilometres and connects Kalena Agrahara to Tavarekere along Bannerghatta Road.

Prime Minister Narendra Modi inaugurated the elevated section on November 13.

The opening is an important milestone for Bengaluru’s public transport network and is expected to improve connectivity along one of the city’s busy road corridors.

What is the new Bengaluru Metro Pink Line?

The Pink Line is part of Namma Metro Phase 2 and is being developed by Bangalore Metro Rail Corporation Limited (BMRCL).

The first operational section is a 7.5 km elevated corridor with six stations.

It is intended to provide metro connectivity to residential areas, educational institutions and important locations along Bannerghatta Road.

Bengaluru Metro Pink Line: Six stations

The newly opened elevated section includes the following stations:

No. Station
1 Kalena Agrahara
2 Hulimavu
3 IIM Bangalore
4 JP Nagar 4th Phase
5 Jayadeva Hospital
6 Tavarekere

The corridor connects areas along Bannerghatta Road and provides a new public transport option for commuters.

What are the Bengaluru Pink Line fares?

According to reports published around the inauguration, fares for the six operational stations range from ₹10 to ₹30.

Passengers should check the fare displayed by BMRCL at the station or through its official ticketing channels before travelling.

The final amount depends on the origin and destination stations.

How frequently will Pink Line trains operate?

Initial reports indicated that trains would operate at approximately eight-minute intervals during peak hours.

BMRCL planned to deploy five trainsets, with one trainset available as standby.

The operating schedule may be revised as passenger demand and service operations develop.

Commuters should check official BMRCL updates for current service timings.

What is the total length of the Pink Line?

The full Pink Line is planned to cover approximately 21.26 kilometres.

It will connect Kalena Agrahara in the south to Nagawara in the north.

The planned corridor includes:

  • 7.5 km elevated section.
  • 13.76 km underground section.
  • 18 stations in total.

The elevated section is now operational, while the underground section is expected to open in stages.

The remaining underground section is expected to become operational by mid-2027, according to the Japan International Cooperation Agency.

How will the Pink Line help Bengaluru commuters?

The new corridor may help reduce dependence on road transport for people travelling along Bannerghatta Road.

Potential benefits include:

  1. Better connectivity to IIM Bangalore.
  2. Easier access to Jayadeva Hospital.
  3. Additional public transport options for southern Bengaluru.
  4. Reduced pressure on busy road corridors.
  5. Better connectivity with the wider Namma Metro network as future sections open.

The actual impact on traffic will depend on passenger adoption, last-mile connectivity and the availability of reliable feeder services.

What is Japan’s role in the Pink Line project?

The Japan International Cooperation Agency (JICA) supported Bengaluru Metro Phase 2 through a Japanese Official Development Assistance loan.

Its support covers signalling, train control systems, rolling stock and consulting services.

The project is an example of India-Japan cooperation in urban infrastructure and public transport development.

Frequently Asked Questions

1. When did Bengaluru Metro Pink Line open?

The first elevated section began passenger services on November 14, 2026, following its inauguration on November 13.

2. What is the length of the operational Pink Line section?

The newly operational elevated section is 7.5 kilometres long.

3. How many stations are currently open?

Six stations are included in the first operational elevated section.

4. What are the six Pink Line stations?

Kalena Agrahara, Hulimavu, IIM Bangalore, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere.

5. What is the reported Pink Line ticket fare?

Reported fares for the operational stretch range from ₹10 to ₹30. Passengers should check the official fare for their journey.

6. What is the full planned length of the Pink Line?

The full Pink Line is planned to cover approximately 21.26 kilometres with 18 stations.

7. When will the underground Pink Line section open?

The remaining underground section is expected to become operational by mid-2027, according to JICA.

Conclusion

The opening of Bengaluru Metro’s first Pink Line section is an important development for urban transport in Karnataka.

The 7.5 km elevated corridor adds six stations and provides an additional travel option for commuters along Bannerghatta Road.

The next major milestone will be the completion of the underground section and the full Pink Line connection to Nagawara.

MadhuTV Desk

Madhu TV is a digital news and media platform bringing you timely, relevant and easy-to-understand news from Telangana, Andhra Pradesh, India and around the world.

Leave a Comment